Feasibility Study (FS)
- Feasibility Study (FS) Waste to Energy Power Plant – BATAM. December 2010
- Feasibility Study (FS) Utilization of biogas / methane from palm oil processing liquid waste (POME = Palm Oil Mill Effluent) to be used as a power plant in North Sumatra, 2012
- Feasibility Study (FS) of Biomass Power Plant (PLTBm) in Kab. Manggarai Timur – NTT. 2014
- Feasibility Study (FS) Utilization of 12 KWp PV for clean water supply in the Pastoral Wailengga Area – Manggarai Timur. 2016
- Feasibility Study (FS) Pilot Project of Hybrid PV and Pumped Storage 200 KWp. in Kab. Kulon Progo – Yogyakarta, 2016
-
Interactive discussion about Renewable Energy
- Discussion on “feed in tariff” for electricity from wind energy (PLTB = Pembangkit Listrik Tenaga Bayu), in collaboration with UNDP (United Nation of Development Programs)
Bandung, March 2012 - Interactive discussion with the topic “Evaluation of the implementation of Perpres No. 5/2006 concerning energy mix, particularly the role of renewable energy ”
January 25, 2012 - Attending and being an active participant in the discussion on “feed in tariff” for renewable energy sources, especially PLTS (Pembangkit Listrik Tenaga Surya) at the Directorate General of EBTKE – Ministry of Energy and Mineral Resources, 2012
- Organized a “round table discussion” (RTD) to discuss and seek integrated solutions to the problems faced by the small industry Bio-ethanol – METI. Jakarta, 23 May 2013
- Promoting the implementation of renewable energy as well as the Desa Mandiri Energi (DME) program through the role of a speaker at the “Leaders Dialoque” event held by BEM Faculty of Economics, University of Indonesia, 4 December 2013
- Discussion on “feed in tariff” for electricity from wind energy (PLTB = Pembangkit Listrik Tenaga Bayu), in collaboration with UNDP (United Nation of Development Programs)
-
Provide assistance for research on Renewable Energy topics
- Research Assistance “Study of utilization of Bintaro waste oil as solid fuel”
(Desi Puspita N. – IPB University) 2013 - Research Assistance “Design and performance test of Biomass stoves with coconut fuel for households”
(Rangky Hudaybiah – IPB University) 2015 - Implementation of a solar drying machine for seaweed in Ped Village – Nusa Penida,
collaboration with Postgraduate / Renewable Energy University of Darma Persada – Jakarta, 2014 - Assistance for the Implementation of Renewable Energy Hybrid Solar Dryer program.
For drying shallots in Kab. Majalengka – Jawa Barat, 2014 - Program assistance for the implementation of “Over-unity Genset” technology with PT Adhijaya Mustika Energi (AME), for lighting in areas that have not yet had electricity, in Desa Tambakromo, Kab. Gunung Kidul – Yogyakarta, 2019
- Research Assistance “Study of utilization of Bintaro waste oil as solid fuel”
-
Exploring cooperation in the implementation of a Biomass Power Plant (PLTBm)
-
The first planting activity of Gamal trees as raw material for the Biomass Power Plant (PLTBm) together with the Regent and the Community in the District. East Manggarai – East Nusa Tenggara
- Penanaman perdana pohon Gamal untuk bahan bakar Pembangkit Listrik Tenaga Biomassa bersama Bupati Kab. Manggarai Timur – Nusa Tenggara Timur
- Penanaman perdana pohon Gamal sebagai bahan bakar untuk PLTBm bersama Bupati Kab. Manggarai Timur – Nusa Tenggara Timur
- Kondisi lahan penanaman pohon Gamal untuk Pembangkit Listrik Tenaga Biomass (PLTBm) di Kab. Manggarai Timur NTT
- Kondisi lahan yang ditanami Pohon Gamal sebagai bahan bakar untuk Pembangkit Listrik Tenaga Biomassa di Desa Gunung, Kec. Kota Komba, Kab. Manggarai Timur – Nusa Tenggara Timur
-
Implementation of a drying machine (Hybrid Solar – Biomass Dryer) for drying shallots by “Cipta Raharja” farmer group in Desa Cibunut, Kec. Argapura – Kab. Majalengka, Jawa Barat
- Implementasi mesin pengering HYBRID (Surya & Biomass)
- Implementasi mesin pengering HYBRID (Surya & Biomass)
- Tampak mesin pengering bawang merah HYBRID (Surya & Biomass)
- Pelatihan Teknis Implementasi mesin pengering HYBRID (Surya & Biomass) bersama tim IPB
- Pelatihan Teknis Implementasi mesin pengering HYBRID (Surya & Biomass) bersama tim IPB
-
Exploration of Collaborative Biogas Implementation Programs in several universities in Indonesia
-
Strategy Workshop on Accelerating the Development of Energy Plantation Forests in Java (Ministry of Environment and Forestry, Republic of Indonesia)
Perumusan Strategi Percepatan Operasionalisasi Hutan Tanaman Energi di Pulau Jawa
-
Exploration of “Over-unity Genset” Lighting Technology Cooperation in the Jimbaran Village, Tambakromo Village, Kab. Gunung Kidul, D.I. Yogyakarta.
(Yayasan Energi Lestari – PT. Adhijaya Mustika Energi)Implementasi teknologi Over Unity Genset untuk bantuan penerangan didaerah tertinggal